1. Zero Signal Delay
Dual signals from the fire alarm control panel or pressure switch are
connected in parallel and fed directly into the pump control cabinet
without passing through an additional relay. The dual power supply
switching device has an actuation time of ≤2 seconds, meeting the
requirements of GB 50974-2014.
2. Combined Use of Soft Start and Direct Start for Motors
• Electric pumps ≤132 kW: Direct-on-line (DOL) starts within 20–30 seconds to reach rated operating conditions.
• >132 kW or diesel engines: Soft start, star-delta, or fast diesel
generator sets are used to start the pump and boost pressure within 55
seconds.
• High-end diesel pumps: Electronic fuel injection and a preheating
system allow full load in 5–15 seconds. 3. Pump Unit "Hot Standby"
The diesel generator set is preheated to 50°C at all times. The electric pump performs a 1-minute self-test every 24 hours, ensuring optimal bearing lubrication and coupling alignment, and starts without sticking.
4. One-Button Emergency
A mechanical emergency start handle is installed on the control cabinet. Even in the event of a PLC failure, manual operation can close the main circuit within 3 seconds. The duty room is equipped with GSM or NB-IoT remote start, allowing a mobile phone call to trigger the pump start within 20 seconds.

Company Profile
Petrel's foreign trade share takes around 50%. To meet standards and requirement of different foreign clients, Petrel continuously improve its production management.
Petrel improves product management system by ensuring the trackability of raw material sourcing, heat treatment process, and machining accuracy. The codes on key parts allow Petrel to track which steel mill supplies the material, which factory conducts the heat treatment, inspection records of fine machining, etc.
To sustain products' high quality, Petrel heavily invests its calibration lab by importing various inspection equipment, such as spectrometers, Brinell hardness gauges, coordinate measuring machine, etc.
To promote and sustain a high level of productivity and safety, Petrel also pays attention to employee training, which includes 6s lean methodology, instructions of equipment, standards, requirement of production process, etc.
Work Specifications:Wuxi Petrel supplied BAOSTEEL with descaling pumps which are originally designed···
READ MOREWork Specifications:Wuxi Petrel supplied NETZSCH with industrial pumps which are originally designed···
READ MOREWork Specifications:Since 2009, Wuxi Petrel has been serving as an OEM for Weatherford's W-serie···
READ MOREAnother widely used industry for our 5ZW100 pump is Metal Powder Atomization. This 450KW high pressu···
READ MOREBesides of the outlet pressure readout and vibration from the fluid end, the other significant inspe···
READ MOREEvery pump we sell will go through a routine test run before delivery. The normal process is:1. No-l···
READ MORE